Black Lion GroupMining
Aerial view of a benched open-pit mine at dusk, work lights glowing on the pit floor under the last ember of sunset

Black Lion Group · Mining

We operate and optimise mining assets.

BLG Mining is the resources division of Black Lion Group. Our crews run every stage of a mining operation, from the blast hole to the final product, with safety and compliance run in-house to the same standard. In production today: copper in the Kunene Region of Namibia and anthracite in KwaZulu-Natal.

Talk to us about a project ↗

Overview

One company, every stage.

BLG Mining is the resources division of Black Lion Group, and it runs on a simple rule: the people who state a number are the people who stand behind it. The geologists who model the resource run the grade control. The surveyors who measure the month carry the payment certificates. The crews on the bench work for us, not for a contractor three layers removed.

That structure is also why the operation moves at private-company speed. Drill and blast, load and haul, geology, survey, mine planning, metallurgy and processing all sit in-house, so a decision taken in the morning is on the bench by the afternoon.

The standards are not our own invention. We are certified to ISO 45001 for occupational health and safety and ISO 14001 for environmental management, and our resource work is JORC and SAMREC compliant, independently audited to the standards the majors work to.

BLG Mining crews and equipment working an active bench, seen up close
The operation, up close

Live operations

Two mines in production.

Both operations are mining, processing and selling product today, and each one finishes what it digs on its own site.

Red-brown benched walls of the Kamanjab copper pit in the Kunene Region, Namibia
Kunene Region, Namibia
Project · Namibia

Kamanjab Copper Mine

An open-pit copper operation producing 25,000 tonnes of ROM a month and finishing it without leaving site: crushed, leached in agitated tanks and electrowon to copper cathode inside the mine boundary, at 85% recovery in circuit.

Ownership
100% Cutra Mining Namibia (operated by us)
Commodity
Copper (oxide & sulphide)
Mining Method
Opencast, truck & shovel
Production
25,000 T ROM / month
Processing
Crushing, agitated leach, electrowinning
Recovery
85% Cu in circuit
Equipment
Doosan excavators & ADTs
Workforce
20 personnel

The Kamanjab dossier →

A long opencast strip cut at the Natal Anthracite Mine, black seam against green KwaZulu-Natal grassland
Vryheid, KwaZulu-Natal
Project · South Africa

Natal Anthracite Mine

Opencast strip mining of a two-metre anthracite seam at Vryheid, producing 30,000 tonnes of ROM a month and washing it on site through crushing, screening and dense-media separation to a saleable product.

Ownership
100% BLG Mining
Commodity
Washed anthracite
Mining Method
Opencast strip mining
Production
30,000 T ROM / month
Processing
Crushing, screening & DMS wash
Recovery
65%
Equipment
Doosan ADTs & excavators
Seam Height
2 m average

The Natal dossier →

Capabilities

What we run in-house.

Eight disciplines, one management line. This is how our mines run day to day, and it is what we bring to any project, partnership or operation we take on.

Opencast & Underground Mining

End-to-end ownership of opencast and underground operations across active sites in Namibia and South Africa.

Drilling & Blasting

Full in-house drill and blast: ANFO, emulsion and electronic detonation, designed to the fragmentation the plant wants.

Loading & Hauling

A GPS-dispatched fleet run on match-factor optimisation, operated by our own trained crews.

Underground Development

150 m per month per crew, supported by experienced shift crews and modern equipment.

Geology & Resources

JORC and SAMREC compliant resource definition with Competent Person reports, Leapfrog Geo and Datamine modelling, and RC grade control on a 50 m × 50 m pattern.

Surveying & Mine Planning

Thirty years of survey experience, UAV drone mapping, monthly volumetric surveys, and mine design through Surpac, Minesched and Whittle.

Metallurgy & Processing

Copper leach and coal washability handled by in-house metallurgy, from bench-scale testwork to plant reconciliation.

HSE & Compliance

Zero Harm backed by ISO 45001 and ISO 14001 systems, 40 hours of annual refresher training, and concurrent rehabilitation.

The operation in depth →

Safety & environment

Zero Harm, run as a system.

Any employee can stop a job, no supervisor can restart it by pulling rank, and the ground behind the face is rehabilitated while the mine still works. Certified, externally audited, and planned that way from the first blast.

How we run safely →

Speak with BLG Mining.

Project partnerships, offtake, operational opportunities, safety and compliance work across sub-Saharan Africa, or the USA expansion: tell us what you are looking at and we’ll come back to you within one business day.